06.09.2016

Projects in metallurgy

Smelting equipment

rez

Riga electrical – mechanical plant (Latvia)

Power supply for open type DC EAF / 3 t / steel smelting

graphite

ООО “Technografit” (Russia)

1100 kWt current balancing reactor for graphitation furnace

elektrostal

АО “Electrostal” (Russia)

Vacuum DC EAF 12 kA rectifier

copper

ОАО “Belcvetmet” (Belarus)

Induction furnace for copper alloy smelting

logo-Nornikel

Norilsk nickel (Russia)

Power supply for open type DC EAF / 1 t / steel smelting

esr

Orsk metallurgical plant (Russia)

Electroslag remelting process furnace 3000 kWt power supply

Picture2

Sukholozhsky scrap plant (Russia)

6 t. capacity EAF implementation

Picture1

ОАО «Tyazhprssmash» — press-forging production (Russia)

20 t. capacity melting complex for special steel smelting

suhoi

Sukhoi group (Russia)

Open type DC EAF / 1 t / steel smelting

 sumy

Sumy metallurgical plant (Ukraine)

Open type DC EAF / 3 t / steel smelting

 nikopol

Nikopolsky ferroalloy smelting plant (Ukraine)

Open type DC EAF / 1 t / ferroalloy smelting

 gazgroup

GAZ group (Rusia)

Dual mixer-furnace for steel smelting

 obukhov

Obukhovsky metallurgical plant (Russia)

Open type DC EAF / 1 t / steel smelting

 titanium

VSMPO Avisma (Russia)

Titanium smelting vacuum DC EAF power supply

 melting

Ferroalloy smelting plant (Kazakhstan)

Open type DC EAF / 3 t / ferroalloy smelting

DUG3

Sukholozhsky ferroalloy scrap plant (Russia)

Open type DC EAF / 3 t / steel smelting

12

Zaporozhsky steel smelting plant (Ukraine)

Open type DC EAF / 1.5 t / steel smelting

strel

Novossibirsk railway point plant (Russia)

Open type DC EAF / 1 t / steel smelting

stc

Stupinsky titanium company (Russia)

Open type DC EAF / 1 t / titanium smelting